Skip to content
Project pipeline

Opportunities
in focus.

A working view of the investment opportunities BISMIN is developing and facilitating across Tanzania and Zanzibar — from tourism and conservation to ports, water and energy.

36

Projects in the pipeline

7

Sector groups

USD 2.6B+

Indicative pipeline value

4 projects

Tourism & Transport Infrastructure

Access, aviation and visitor infrastructure to diversify Tanzania's tourism offer beyond the Northern Circuit.

TANAPA · NCAA

TAN-01 TANAPA · NCAA

Climate Nature Resilient Roads & Trails Infrastructure

Upgrading and maintaining 3,833 km of all-weather roads, 185 drainage structures and 80 km of eco-trails across 19+ national parks, plus hardening of 99 km on the Serengeti main road. Aims to diversify tourism from the Northern Circuit to the under-utilised Southern and Western circuits. Projected to attract 250,000+ additional tourists per year, generating USD 21M in direct and USD 63M in economy-wide annual returns. BCR of 8.2:1 over 10 years.

Read full brief

Upgrading and maintaining 3,833 km of all-weather roads, 185 drainage structures and 80 km of eco-trails across 19+ national parks, plus hardening of 99 km on the Serengeti main road. Aims to diversify tourism from the Northern Circuit to the under-utilised Southern and Western circuits. Projected to attract 250,000+ additional tourists per year, generating USD 21M in direct and USD 63M in economy-wide annual returns. BCR of 8.2:1 over 10 years.

Estimated cost

USD 110–120M

Proposal developed; seeking donor support (WB, UNDP, AfDB, bilateral donors)
TAN-02 TANAPA · NCAA

Tourism Infrastructure Development

Expanding and modernising tourism facilities across 13 national parks: 52 new and 6 renovated accommodation units, visitor lounges and services, 8 new revenue collection gates, and new tourism products (rhino sanctuaries, boardwalks, cable cars, water bikes). Projected BCR of 15.6:1. Estimated to create 15,000 temporary construction jobs and 20,000 permanent tourism-linked positions.

Read full brief

Expanding and modernising tourism facilities across 13 national parks: 52 new and 6 renovated accommodation units, visitor lounges and services, 8 new revenue collection gates, and new tourism products (rhino sanctuaries, boardwalks, cable cars, water bikes). Projected BCR of 15.6:1. Estimated to create 15,000 temporary construction jobs and 20,000 permanent tourism-linked positions.

Estimated cost

USD 32.2M

Proposal developed; seeking donor support
TAN-06 TANAPA · NCAA

Development of 8 Aerodromes Infrastructure – National Parks

Construction of Iluma airstrip (Ugalla River NP) and rehabilitation of seven aerodromes: Seronera (Serengeti), Mahale, Rubondo, Nkonje (Burigi-Chato), Kagaga (Ibanda-Kyerwa), Saadani and Kuro (Tarangire). Expected to increase passenger capacity by 40–50%.

Read full brief

Construction of Iluma airstrip (Ugalla River NP) and rehabilitation of seven aerodromes: Seronera (Serengeti), Mahale, Rubondo, Nkonje (Burigi-Chato), Kagaga (Ibanda-Kyerwa), Saadani and Kuro (Tarangire). Expected to increase passenger capacity by 40–50%.

Estimated cost

USD 32.2M

Proposal developed (August 2023); financial and economic analysis complete
NCAA-01 NCAA

NCA Road Upgrade & Network Expansion

88 km main road construction in three lots (Loduare–Seneto 29.5 km, Seneto–Olduvai 33.5 km, Olduvai–Serengeti 30 km), plus 586 km of new roads to connect remote tourism attractions.

Estimated cost

USD 84.4M

Detailed design complete for Lot 1; GoT committed USD 14M; investment sought USD 70.4M
3 projects

Conservation, Biodiversity & Community Livelihoods

Protecting the natural assets that underpin the tourism economy while improving livelihoods in surrounding communities.

TANAPA

TAN-03 TANAPA

Community-Based Human-Wildlife Coexistence & Livelihood

Establishment of 8 community Problem Animal Control Centres, training of 160 Village Game Scouts, early-warning systems and conflict-mitigation technologies. Livelihood diversification benefiting 2,000+ households. BCR of 1.69:1 with 56.7% ERR.

Read full brief

Establishment of 8 community Problem Animal Control Centres, training of 160 Village Game Scouts, early-warning systems and conflict-mitigation technologies. Livelihood diversification benefiting 2,000+ households. BCR of 1.69:1 with 56.7% ERR.

Estimated cost

USD 30M

Proposal developed; seeking donor funding
TAN-04 TANAPA

Digital Technology for Wildlife Protection & Smart Park Management

Technology investment across 21 national parks: digital radios, drones, GPS trackers, camera traps, an intelligence database, 10 rapid-response vehicles, 3 surveillance aircraft, 13 armouries and ICT upgrades. BCR of 3.5:1.

Read full brief

Technology investment across 21 national parks: digital radios, drones, GPS trackers, camera traps, an intelligence database, 10 rapid-response vehicles, 3 surveillance aircraft, 13 armouries and ICT upgrades. BCR of 3.5:1.

Estimated cost

USD 70M

Proposal developed; aligns with multiple donor priorities
TAN-05 TANAPA

Habitat Restoration & Biodiversity Conservation – Northern Circuit

60-month initiative across Lake Manyara, Arusha and Kilimanjaro NPs: invasive species clearance, riparian restoration, reforestation and 15 Community Conservation Banks. Targets water security for 5M+ people in the Pangani Basin. BCR of 7–30:1.

Read full brief

60-month initiative across Lake Manyara, Arusha and Kilimanjaro NPs: invasive species clearance, riparian restoration, reforestation and 15 Community Conservation Banks. Targets water security for 5M+ people in the Pangani Basin. BCR of 7–30:1.

Estimated cost

USD 8.5M

Concept note; seeking partners
4 projects

Blue Economy – Zanzibar

Joint-venture opportunities in aquaculture, deep-sea fishing, clean cooking energy and maritime manufacturing.

MoBE&F / ZPC

ZNZ-01 MoBE&F / ZPC

Marine Fish Cage Farming – Unguja & Pemba

320 offshore production cages with modern feeding and monitoring systems. ESIA-compliant and aligned with FYDP-IV.

Estimated cost

USD 89.4M

Concept note; joint venture structure proposed
ZNZ-02 MoBE&F / ZPC

Sustainable Deep-Sea Fishing Industry

Deep-sea fishing capacity development including modern vessels, landing-site upgrades and fisheries management. Targets a 30–50% increase in offshore production and 500–700 direct jobs.

Estimated cost

USD 92M

Concept developed; joint venture structure proposed
ZNZ-03 MoBE&F / ZPC

CNG Distribution for Zanzibar

Compressed natural gas for commercial and household customers, replacing traditional energy sources (firewood 46.9%, charcoal 28.9%).

Estimated cost

USD 10M

Concept note; joint venture structure proposed
ZNZ-04 MoBE&F / ZPC

Commercial Boat Building & Maintenance Factory

Modern boat manufacturing and maintenance facility replacing traditional wooden boats and reducing import dependence.

Estimated cost

USD 5.7M

Concept note; joint venture structure proposed
6 projects

ZAFICO Fisheries Pipeline

Near-term, smaller-ticket impact investments across processing, cold chain, aquaculture and market access.

ZAFICO

ZAF-01 / ZAF-02 ZAFICO

Anchovy Processing & Value Addition (Kama + Ndagoni)

Processing units for drying, grinding and packaging anchovy products for domestic and export markets.

Estimated cost

USD 1.6M (2 sites)

Construction ready
ZAF-04 ZAFICO

Integrated Deepsea Fishing Vessels & Processing (Fungurefu)

Deep-sea fishing vessels integrated with an onshore processing plant.

Estimated cost

USD 8M

Procurement stage
ZAF-07 ZAFICO

Fish Cage Farming (Bwereo)

Marine cage farming systems in coastal waters with feed systems and monitoring.

Estimated cost

USD 10M

Development stage
ZAF-05 ZAFICO

Integrated Octopus & Fish Processing Factory (Shumba Mjini)

Export-oriented processing plant for octopus and fish products.

Estimated cost

USD 5M

Development stage
ZAF-14 ZAFICO

Fisheries One Stop Centre – Samaki House (Funguni)

Centralised fisheries support centre with office complex and integrated service delivery.

Estimated cost

USD 5M

Concept note
ZAF-03, 06, 08–13, 15–18 ZAFICO

Remaining 12 ZAFICO projects

Coldroom, ice production and wharf; Malindi fishmarket annex; fish feed factory; shrimp farming; Kizimkazi cold storage; cold storage & ice plant service model; digital fish market; Fish4Boat programme; solar drying; collection and distribution logistics; sports fishing; and value addition / nutrition initiatives. Details in the summary table.

Read full brief

Coldroom, ice production and wharf; Malindi fishmarket annex; fish feed factory; shrimp farming; Kizimkazi cold storage; cold storage & ice plant service model; digital fish market; Fish4Boat programme; solar drying; collection and distribution logistics; sports fishing; and value addition / nutrition initiatives. Details in the summary table.

Estimated cost

USD 13.15M combined

Various stages (idea to finalisation)
7 projects

Zanzibar Integrated Blue Economy – Ports & Infrastructure

Port, road and cold-chain assets requiring structuring for PPP, concession and blended finance.

RGoZ

ZDB-01 RGoZ

Strategic Roads 277.7km + Uzi Bridge

Road construction across Unguja and Pemba. Requires updated safeguards consolidation, climate adaptation integration and a defined O&M financing plan for full bankability.

Estimated cost

USD 179M

Under implementation (~42% progress); feasibility, ESIA & economic evaluation completed
ZDB-02 RGoZ

Multi-Purpose Fishing Port in Chuini (Unguja)

Multi-purpose fishing port with concept-level engineering defined. Requires a final bankable financial model, PPP/concession structuring, climate resilience validation and E&S documentation to MDB standards.

Estimated cost

USD 28.2M

Full feasibility completed; blended financing structure (MDB + private equity)
ZDB-03 RGoZ

Multi-Purpose Fishing Port in Shumba Mjini (Pemba)

Smaller-scale facility with strong artisanal value-chain impact. Requires E&S consolidation, climate screening, O&M capacity strengthening and revenue model validation.

Estimated cost

USD 10.32M

Feasibility completed; port basin and landing infrastructure defined
ZDB-04 RGoZ

Mangapwani Multipurpose Port (Unguja)

Strategic multipurpose port requiring full feasibility validation, a detailed financial model, coastal and climate risk assessment, E&S documentation and a PPP/concession structure.

Estimated cost

USD 222M

Planning stage; Master Plan allocation
ZDB-05 RGoZ

Dedicated Industrial Fishing Port (Zanzibar)

Requires demand validation, a bankable revenue model, an operational sustainability plan, E&S documentation and defined performance indicators.

Estimated cost

USD 165M

Sector allocation identified; project-level structuring required
ZDB-06 RGoZ

Mkoani & Wete Port Rehabilitation (Pemba)

Requires engineering validation, updated E&S documentation, climate screening and a defined O&M sustainability framework.

Estimated cost

USD 27M

Rehabilitation concept identified
ZDB-07 RGoZ

Cold Chain & Processing Infrastructure (Unguja & Pemba)

Requires demand analysis, financial modelling, a private operator structure, blended-finance design and a measurable livelihood impact framework.

Estimated cost

USD 38M

Value-chain infrastructure concept (ice plants, storage, processing)
5 projects

National Water Fund – Water Infrastructure

Urban, district and strategic water supply investments, with partial government co-financing in place.

NWF / RUWASA

NWF-01 to NWF-04 NWF / RUWASA

RUWASA Portfolio (4 projects)

Water Supply Services (USD 32M), Magu District Water (USD 35M), Mbulu District Water (USD 25M, fully funded) and Mbaga Phase II (USD 31M). Rural and district-level water infrastructure expansion.

Estimated cost

USD 123M combined

Mixed: Mbulu fully funded; others require financing
NWF-05 NWF / RUWASA

Lugoda Dam Project (Iringa)

Integrated multi-purpose project: drinking water, irrigation and power generation.

Estimated cost

USD 130M

Financing required
NWF-06 NWF / RUWASA

Tunduma Water Supply Project

Major water supply infrastructure for the Tunduma area.

Estimated cost

USD 170M

Financing required
NWF-07 NWF / RUWASA

Dodoma Immediate Water Shortage Solution

Urgent water supply solution for the capital; half the financing already committed by government.

Estimated cost

USD 40M

USD 20M secured from GoT; USD 20M co-financing gap
NWF-08 NWF / RUWASA

National Water Grid / Water Master Plan

National-level water master planning. Requires technical and financial support to advance.

Estimated cost

USD 20M

Pre-feasibility completed
7 projects

Energy & Grid Infrastructure – Zanzibar

Grid modernisation, transmission, storage and renewable generation to strengthen Zanzibar's power system. All projects have concept notes in place.

RGoZ / ZECO (GAIS PIPELINE)

GAIS-01 RGoZ / ZECO (GAIS PIPELINE)

Grid Substation Upgrades, Automation & Digital Transformation

System-wide grid substation upgrades with automation and digital transformation. The largest single project in the energy pipeline.

Estimated cost

USD 381.5M

Concept note in place
GAIS-10 RGoZ / ZECO (GAIS PIPELINE)

ZECO Commercial Loss Reduction

Reducing commercial losses from 15.21% to 10% through smart metering, transformer monitoring, anti-fraud systems and regional ZECO service centres.

Estimated cost

USD 109M

Concept note in place
GAIS-02 RGoZ / ZECO (GAIS PIPELINE)

Reinforcement of Fiber Telecommunication Infrastructures

Strengthening fibre-optic telecommunications infrastructure supporting grid operations and connectivity.

Estimated cost

USD 99.7M

Concept note in place
GAIS-07 RGoZ / ZECO (GAIS PIPELINE)

Distributed Energy Storage 60MWh

Energy storage systems for peak-load management and electrification of small islands (Uzi, Tumbatu, Tumbe, Kojani).

Estimated cost

USD 90M

Concept note in place
GAIS-06 RGoZ / ZECO (GAIS PIPELINE)

30MW Solar Plant with 10MWh Battery (Matemwe)

Solar PV generation with battery storage at Matemwe, Unguja.

Estimated cost

USD 70M

Concept note in place
GAIS-11 to GAIS-15 RGoZ / ZECO (GAIS PIPELINE)

Grid Stabilization Phase II (5 projects)

Five transmission line and substation projects: Kilombero–Mangapwani (USD 17M), Ubaga–Dunga (USD 13M), Matemwe–Nungwi (USD 15M), Fumba substation (USD 11M) and the Makunduchi–Matemwe 220kV backbone (USD 28.4M).

Estimated cost

USD 84.4M combined

All concept notes in place
GAIS-03, 04, 05, 08, 09 RGoZ / ZECO (GAIS PIPELINE)

Network Rehabilitation (5 projects)

132kV submarine cable replacement (USD 29M), 33kV switchyard extension (USD 4M), 60MVA transformer at Mtoni (USD 1.9M), 11kV-to-33kV distribution upgrade (USD 6.5M) and 33kV reconductoring (USD 4.6M).

Estimated cost

USD 46.0M combined

All concept notes in place
Work with BISMIN

Have an opportunity that needs structure?

We help sponsors and institutions turn a credible idea into a project that can be discussed, financed and delivered.